Saturday, May 6, 2017

Foundation Construction 4/21 - 5/5

Another Load of 3" Base

April 21st

Water is receeding

Extent of Base Rock until Foundation complete - Good idea Curt!

Re-bar is ready

Driveway Base

Footing forms for 1ft step down

Crew at work

April 22nd

Large and Deep Integral Pier Footings


1 ft step footing

Large and Deep Integral Pier at front garage - note the rebar!

Deep Pier Footing - note the sump for pumping!

Angle Points - Vertical and Horiz

1 ft step footing near back patio

Ditto

2 Bars in footing

2 large/deep pier footings at back garage - trying to keep this area dry!

Water continues seeping at about 3 ft deep at south end of garage


Forms to support Re-bar

Deep footing in water - this ended up drying out

Crawl Space drying out a bit

Forms a bit higher than grade

Forms a bit higher than grade

Forms a bit high



Forms at back of garage - SE corner

Large/Deep Pier in middle of house under water
May need to install crawl space drain for this?

Electrical Conduits in

Bruce and Jess working out the details

Ditto

4/26/17 - 7:30 am Pumper is ready and waiting for Sequim Redi-Mix

ditto

10am - work is done!

Concrete displaced the water




Front Porch Pier Pad


Thursday 4/27/17 - Stripping forms

Water monitoring - 4/27

4/27 - Begin forming Stemwalls


Stemwall Panels staged


Defective Vent Repair by Roger

16 vents under repair

Monday - 5/2/2017



Tuesday 5/2/17 - prepping for tomorrows pour

Monitoring this water

10" Step at garage


Vents are in place

3 ft wall at north end


Keep Pumping Rog

Hold-down between garage doors

2 of the 33 Anchor Bolts for the Hold-downs

Braces to support the walls


Garage back door





Garage Hold-down

P24 forms - cardboard boxes


Boxes staged and ready to be filled with concrete

Sequim Redo-Mix - Load 1 of 3



Bruce aims - Brian and Jess inspect

Chris is ready to help

Bruce wore a white shirt??


Brian is banging out the air bubbles

Jess is making final adjustments by hand








Chris is pleased with the Slump

Defective Cardboard forms? 
Let the wagering begin on how many will fail



Done - Defective cardboard forms repaired

May the 4th be with this crew!  Job well done!


Stripping forms - May 4th - Thursday.





Thursday, May 4th



Thursday, May 4th