View looking west from our future front door at Klahanie Ridge Ground Breaking April 18, 2017 Building Site - prior to excavation Building site prior to excavation Excavation Equipment Arrives Curt and Tim from C&J begin footing exc Water at 3 ft below ground Water seeping at base of excavation (3 ft) Water Probe in Dark Brown Loam at north end - need to exc another foot Water accumulating - Pumping Culvert going in Thomas Building posts their sign - Thanks Allison Curt crawling over the dirt mounds Overexcavating 1 ft. at north end to get to better base Overexcavation area Driveway Bruce bringing in the forms and equipment Driveway at the end of day 2 Footing formwork on Thursday Geotextile fabric to stabilize the base 6" of 3" base rock Overexcavation area Bruce, Brian, Jess and Chris enjoying Friday Pizza Chris climbs the mountain in his 72 Chev 4x4 Driveway is taking shape Looking a little drier on Friday afternoon |