Saturday, June 10, 2017
Saturday, May 6, 2017
Foundation Construction 4/21 - 5/5
Another Load of 3" Base |
April 21st |
Water is receeding |
Extent of Base Rock until Foundation complete - Good idea Curt! |
Re-bar is ready |
Driveway Base |
Footing forms for 1ft step down |
Crew at work |
April 22nd |
Large and Deep Integral Pier Footings |
1 ft step footing |
Large and Deep Integral Pier at front garage - note the rebar! |
Deep Pier Footing - note the sump for pumping! |
Angle Points - Vertical and Horiz |
1 ft step footing near back patio |
Ditto |
2 Bars in footing |
2 large/deep pier footings at back garage - trying to keep this area dry! |
Water continues seeping at about 3 ft deep at south end of garage |
Forms to support Re-bar |
Deep footing in water - this ended up drying out |
Crawl Space drying out a bit |
Forms a bit higher than grade |
Forms a bit higher than grade |
Forms a bit high |
Forms at back of garage - SE corner |
Large/Deep Pier in middle of house under water
May need to install crawl space drain for this?
|
Electrical Conduits in |
Bruce and Jess working out the details |
Ditto |
4/26/17 - 7:30 am Pumper is ready and waiting for Sequim Redi-Mix |
ditto |
10am - work is done! |
Concrete displaced the water |
Front Porch Pier Pad |
Thursday 4/27/17 - Stripping forms |
Water monitoring - 4/27 |
4/27 - Begin forming Stemwalls |
Stemwall Panels staged |
Defective Vent Repair by Roger |
16 vents under repair |
Monday - 5/2/2017 |
Tuesday 5/2/17 - prepping for tomorrows pour |
Monitoring this water |
10" Step at garage |
Vents are in place |
3 ft wall at north end |
Keep Pumping Rog |
Hold-down between garage doors |
2 of the 33 Anchor Bolts for the Hold-downs |
Braces to support the walls |
Garage back door |
Garage Hold-down |
P24 forms - cardboard boxes |
Boxes staged and ready to be filled with concrete |
Sequim Redo-Mix - Load 1 of 3 |
Bruce aims - Brian and Jess inspect |
Chris is ready to help |
Bruce wore a white shirt?? |
Brian is banging out the air bubbles |
Jess is making final adjustments by hand |
Chris is pleased with the Slump |
Defective Cardboard forms?
Let the wagering begin on how many will fail
|
Done - Defective cardboard forms repaired |
May the 4th be with this crew! Job well done! |
Stripping forms - May 4th - Thursday. |
Thursday, May 4th |
Thursday, May 4th |