Saturday, June 10, 2017
Saturday, May 6, 2017
Foundation Construction 4/21 - 5/5
| Another Load of 3" Base |
| April 21st |
| Water is receeding |
| Extent of Base Rock until Foundation complete - Good idea Curt! |
| Re-bar is ready |
| Driveway Base |
| Footing forms for 1ft step down |
| Crew at work |
| April 22nd |
| Large and Deep Integral Pier Footings |
| 1 ft step footing |
| Large and Deep Integral Pier at front garage - note the rebar! |
| Deep Pier Footing - note the sump for pumping! |
| Angle Points - Vertical and Horiz |
| 1 ft step footing near back patio |
| Ditto |
| 2 Bars in footing |
| 2 large/deep pier footings at back garage - trying to keep this area dry! |
| Water continues seeping at about 3 ft deep at south end of garage |
| Forms to support Re-bar |
| Deep footing in water - this ended up drying out |
| Crawl Space drying out a bit |
| Forms a bit higher than grade |
| Forms a bit higher than grade |
| Forms a bit high |
| Forms at back of garage - SE corner |
Large/Deep Pier in middle of house under water
May need to install crawl space drain for this?
|
| Electrical Conduits in |
| Bruce and Jess working out the details |
| Ditto |
| 4/26/17 - 7:30 am Pumper is ready and waiting for Sequim Redi-Mix |
| ditto |
| 10am - work is done! |
| Concrete displaced the water |
| Front Porch Pier Pad |
| Thursday 4/27/17 - Stripping forms |
| Water monitoring - 4/27 |
| 4/27 - Begin forming Stemwalls |
| Stemwall Panels staged |
| Defective Vent Repair by Roger |
| 16 vents under repair |
| Monday - 5/2/2017 |
| Tuesday 5/2/17 - prepping for tomorrows pour |
| Monitoring this water |
| 10" Step at garage |
| Vents are in place |
| 3 ft wall at north end |
| Keep Pumping Rog |
| Hold-down between garage doors |
| 2 of the 33 Anchor Bolts for the Hold-downs |
| Braces to support the walls |
| Garage back door |
| Garage Hold-down |
| P24 forms - cardboard boxes |
| Boxes staged and ready to be filled with concrete |
| Sequim Redo-Mix - Load 1 of 3 |
| Bruce aims - Brian and Jess inspect |
| Chris is ready to help |
| Bruce wore a white shirt?? |
| Brian is banging out the air bubbles |
| Jess is making final adjustments by hand |
| Chris is pleased with the Slump |
Defective Cardboard forms?
Let the wagering begin on how many will fail
|
| Done - Defective cardboard forms repaired |
| May the 4th be with this crew! Job well done! |
| Stripping forms - May 4th - Thursday. |
| Thursday, May 4th |
| Thursday, May 4th |